Piles Foundation in Phnom PenhCapital of Cambodia
    1. Department of Geotechnical and Georesources Engineering, Institute of Technology of Cambodia, Russian Ferderation Blvd., P.O. Box 86, Phnom Penh, Cambodia

Academic Editor:

Received: January 20,2024 / Revised: Accepted: January 20,2024 / Published: June 01,2013

Download PDF
Browse Figures
×

 In the last time the driven pile and bored pile foundation are widely used in Cambodia. And for calculation the bearing capacity of bored pile foundation we have a lot of equations to resolve it by using soil parameters from laboratory test and in-situ test such as static cone penetration test, dynamic cone penetration test, pressiometer test and standard penetration SPT.The problem for us is the inability to take undisturbed sample like the sandy soil at the greater depth, so the capacity of our laboratory can not provide sufficien soil data for calculating the bearing capacity of pile foundation. So we need equation and safety factor suitable for the sub-soil condition in Cambodia by using index SPT and verifying the bearing capacity of bored pile and driven pile foundation we need static pile load test. The research was done in the construction of the Ministry of Land and Management of Cambodia for bored pile and in Sport City, street No211, SangkatVealvong, Khan 7 Makara, Phnom Penh city for driven pile.