Latest Issue
Empowering Education with Online Khmer Handwritten Text Recognition for Teaching and Learning Assistance
Published: August 30,2025Undergraduate Student Dropout Prediction with Class Balancing Techniques
Published: August 30,2025Status of Seawater Quality at Koh Rong Island, Sihanoukville, Cambodia
Published: August 30,2025Low-Complexity Detection of Primary Synchronization Signal for 5G New Radio Terrestrial Cellular System
Published: August 30,2025Word Spotting on Khmer Printed Documents
Published: August 30,2025Tuning Hyperparameters Learning Rate and Gamma in Gym Environment Inverted Pendulum
Published: August 30,2025Examining Passenger Loyalty in Phnom Penh Public Bus System: A Structural Equation Modelling Approach
Published: August 30,2025Prediction on Load model for future load profile of Electric Vehicle charging demand in Phnom Penh
Published: August 30,2025Economic Study on Integrating PV-DG with Grid-Tie: Case Study in Cambodia
Published: August 30,2025A Study on Traffic Signalization to Improve Traffic Flow at Kdan Pir Intersection in Phnom Penh City
-
1. Graduate School of Engineering, Institute of Technology of Cambodia, Russian Federation Blvd., P.O. Box 86, Phnom Penh, Cambodia
Academic Editor:
Received: April 11,2021 / Revised: / Accepted: May 15,2021 / Available online: June 29,2021
Traffic congestion and traffic accident have been a serious and significant problem in Phnom Penh city because the population has increased every year. An insufficient traffic signal, non-standard geometry, driver behavior, and lack of traffic discipline are the main factors that affect traffic flow. Kdan Pir is a very important intersection that has connected between Khan 7 Makara and Khan Toul Kork. Many people are crossing this intersection. This is the reason that makes Kdan Pir intersection always has traffic congestion. This study analyzed the traffic flow at Khan Pir Intersection. The traffic flow was analyzed in a micro-simulation environment using traffic data obtained from the traffic count survey, between 7:00 and 20:00, on 04 November, 2019. With the new geometry of Kdan Pir Intersection, we proposed five alternative solutions for the traffic signalization system. Queue lengths and Level of Services (LOS) were used as indicators for the alternative comparison. Results showed that the best alternative is option five that has a good queue length and level of service.